All resources
New Build Walkthrough Checklist (Alberta)
January 8, 2026 7 min read

Taking possession of a new build in Calgary, Cochrane, Airdrie, or anywhere in Alberta? The pre-possession walkthrough is your one structured opportunity to document deficiencies before you sign off. Use this checklist.
Before walkthrough day
- Confirm date with builder and bring a second person if possible
- Bring: phone (camera), notepad, painter's tape (to mark issues), measuring tape, outlet tester, flashlight
- Block 2–3 hours minimum
- Consider booking a third-party new construction inspection to attend with you
Exterior
- Roof: visible shingle damage, exposed nails, vent boots
- Eavestroughs: securely fastened, downspouts extending away from foundation
- Siding/stucco: gaps, cracks, missing caulking
- Grading: slopes away from foundation
- Driveway, walkways, deck: cracks, tripping hazards, loose boards/railings
- Garage door: opens/closes smoothly, auto-reverse working
- Window exteriors: caulking, screens, missing trim
Interior — every room
- Walls: drywall pops, dings, paint coverage, corner bead
- Ceilings: cracks, paint flaws, light fixtures level and secure
- Floors: scratches, gaps, lippage, squeaks, hollow tile
- Trim & baseboards: gaps, paint, mitre joints
- Doors: latch properly, no rubbing, no gaps to floor
- Windows: open/close/lock, screens present, no broken seals
- Outlets & switches: test every one, GFCI in wet areas
- HVAC: vents in every room, return air grilles
Kitchen
- Cabinets: doors aligned, soft-close working, no missing hardware
- Countertops: chips, scratches, seam quality, secure
- Appliances: run dishwasher full cycle, test oven, test all stovetop burners, check fridge cooling
- Sink: no leaks under, garbage disposal works, faucet aerator clean
Bathrooms
- Run every faucet hot & cold, check drainage
- Flush every toilet, check for rocking
- Check tub/shower for cracks, hot water arrival time, drainage
- Exhaust fans actually exhaust outside
- Caulking around tubs, sinks, toilets — clean & complete
Mechanical room
- Furnace: model/serial photographed, filter installed, clean operation
- Hot water tank: TPR drain piped down, expansion tank if applicable
- Sump pump: present and operating
- HRV/ERV: filters in place, operating
- Electrical panel: labelled, no missing breakers, AFCI/GFCI per code
Document everything
- Photograph every defect with date stamp
- Mark with painter's tape so trades can find them
- Submit a written deficiency list to the builder — keep a copy
- Confirm warranty timelines: most Alberta New Home Warranty workmanship items are 1 year — don't miss the window
Get a second opinion
A third-party new construction inspection typically catches 30–50 deficiencies the builder's walkthrough misses. Worth every dollar before you sign off.
Call (403) 710-7770 or book online.
